In a continued effort to provide clients with state-of-the-art IT infrastructure services, this is to notify you that EPhost Administrators will be performing network maintenance on Monday January 18th 2016.
Type of Work: Network Maintenance
Location: EPhost Data Center San Diego, CA 92123
Purpose: Continued delivery of stable and reliable network operations.
High Level Summary: Replacement of Firewall and Switch Infrastructure.
Window Start: 1/18/2016 @ 9:00 PM PST
Window End: 1/19/2016 @ 2:00 AM PST
Service Impact Summary: The primary uplink will be disconnected at 10PM PST and last approximently 30 minutes. Additionally, as we perform regression tests, EPhost services will be intermitant during the maintenance window. Remote mail servers attempting to send mail during this time will retry after 90 minutes.
Schedule: The window for maintenance is scheduled to begin at 9:00 PM on Monday January 18th 2016, and end at 2:00 AM on Tuesday January 19th 2016. Should additional time be required, notice will be provided and the maintenance window will be extended.
Testing & Planning: All testing and planning being conducted during this window is part of a pre-defined checklist designed by the EPhost Web Administrator team.
Regression Planning: The EPhost Web Administrator team will be on-site managing this window. As with any Network Maintenance, while highly unlikely, there is a possibility that something unexpected may occur during the work process. Should any issues arise, all equipment will be placed back into standard operation and the work will be postponed until the issue is resolved.